A brief description of the Structural & Module Erection scope and what all it entails.
Connect Group successfully completed the structural assembly and exterior finishing scope for a multi-section E-House installation at CNRL. Our team executed the mechanical tie-ins between modular building sections, including structural bolt-up, removal of temporary support steel, and final connection detailing to ensure full structural integrity. Scope also included installation of floor plates, exterior catwalks, platforms, […]
Read More
Connect Group provided the engineering, fabrication, and field installation of specialized structural supports and jacking systems for the 82T-18 rotary breaker replacement in Suncor’s Plant 82 Slurry Preparation Building. The work was developed to safely support the breaker cage and enable removal and replacement of major breaker components during a tightly controlled outage. A key […]
Read More
Connect Group delivered the engineering, fabrication, and field installation of temporary structural systems required to safely execute the 85T-4B breaker end cylinder replacement at Suncor. The scope centered on the design and installation of engineered cage support beams and jacking boxes used to support, restrain, and elevate the breaker during removal and installation of the […]
Read More
During the Spring 2025 Turnaround, Connect Group executed the demolition and replacement of approximately 90% of the liner plates within the 1A and 1B hoppers. Operating within a tightly controlled 24-day outage window, the scope required complex access planning and execution. Work was performed primarily from personnel baskets and lower-elevation scaffolding to safely manage the […]
Read More
Connect Group executed a full upgrade of the conveyor gallery dribble pan and pan wash system to resolve ongoing leakage and material accumulation issues. The solution included engineering and fabrication of modular dribble pan assemblies, which were prefabricated off-site, transported to site, and installed during a scheduled conveyor outage. To accommodate the increased load from […]
Read More
Horizon Oil Sands | SPP2 (2022) & SPP3 (2024) Connect Group successfully executed the removal and replacement of the Slurry Preparation Plant (SPP) launder boxes at Horizon Oil Sands during two major turnaround events. Weighing over 100,000 lbs and positioned within inches of surrounding structure, the lift and replacement required zero-margin precision. The project involved […]
Read More